Project Summary
Leitrim County Council has recently improved shoreside access to its Carrick on Shannon public marina, replacing its existing fixed boardwalk with a new 340m long by 2.4m wide floating walkway.
Client | Leitrim County Council |
Date | November 2020 |
Where | Carrick on Shannon, County Leitrim, Ireland |
Working with Deane Public Works, we designed and manufactured the new installation which includes a 3m wide fuel berth and eight access gangways with lifebuoy housings and safety ladders, all anchored in place by a new piled mooring system.
The heavy-duty pontoon system, topped with our unique glass reinforced concrete (GRC) decking, provides safe and non-slip, all year-round access to the marina’s on-site facilities for the public and all leisure boat users, which includes local boat hire companies.
“Being a very popular cruising area, it was important that we completed the installation with as minimal disruption as possible to the local access,” says Ger Buckley, our project engineer. “We achieved this by taking a phased approach, closely liaising with all contractors and programming the activities in.”
Wrapping around the entire length of the marina site, the public boardwalk now connects the quay side to the access road and car park, allowing users to enter the marina via a new gangway on the eastern side, and exit on the northern side.
The boardwalk will provide a new walking route along the waterfront for both locals and visitors and new access for users of leisure vessels which cruise along this section of the River Shannon, boosting the tourist industry which plays a major role in Carrick on Shannon’s economy.