Marina with boats moored to pontoons inside

Port Dinorwic Marina

We were appointed by The Marine and Property Group Ltd as part of a major project to modernise its Port Dinorwic Marina.

ClientThe Marine Property group
DateInstalled September 2020
WherePort Dinorwic Marina, Y Felinheli, Gwynedd, Wales

Acquired by The Marine Group in 2017, the Grade II listed, 180-berth full-service marina on the coast of North Wales received a complete refresh of its marina hardware as part of a major upgrade project.

As part of our sustainability effort, we endeavoured to work and adapt as much of the existing infrastructure as possible but where this wasn’t feasible, we replaced walkways and finger pontoons completely with our highly respected marina pontoons with Glass Reinforced Concrete (GRC) pontoon decking.

This aesthetically pleasing GRC pontoon decking remains slip resistant when wet and doesn’t rot, considerably reducing maintenance costs while increasing the longevity of the marina system.

Marina with boats moored to pontoons inside

We chose to work with Inland and Coastal Marina Systems as, not only do they produce quality durable pontoon systems, but the team is keen to work with and utilise much of what currently exists, making the most efficient use of time and resources.

— Christopher Odling-Smee, Director of The Marine & Property Group

Have you got a similar Project in mind?