Project Summary
In 2018, we installed a 36m x 4.8m heavy-duty pontoon with a 1m freeboard in the harbour at Berwick upon Tweed, Northumberland.
Client | Harbour Commission |
Date | Installed 2018 |
Where | Berwick upon Tweed, Northumberland |
Decked with Timber Effect GRC (Glassfibre Reinforced Concrete) and accessible via a new 24m x 1.25m bridge, the unit also has high level security lighting and service bollards with power and water. As the highest tide level is close to the height of the quay, we designed a bespoke cantilever platform which lifts the bridge to 1m above quay height, ensuring constant access, no matter what the height of the tide.
Completed for the Harbour Commission, this large floating pontoon is mainly used for safe access and agrees to the quayside for cruise ship tenders bringing passengers ashore, visiting yachts and leisure craft as well as occasionally by the RNLI.